Research shows Data Centre Space Take-Up Jumps 18 Per Cent

 

Gateway Data Centre Exterior

Gateway Data Centre Exterior

Research just released by GVA Connect, the data centre specialist division of property agents GVA, showed UK take-up of data centre space amounted to 830,000 square feet (gross retail area) in calendar year 2013.

 

“This represented an 18 per cent jump in data centre space take-up over the previous year,” said GVA Connect director Charles Carden, adding that the company expected take-up to remain at this level during 2014.

 

Confirming London’s position as a leading international data centre hub, Carden revealed that over three quarters of the 2013 data centre take-up was within the so-called London Synchronous Locations (locations which deliver round-trip latency of under three milliseconds).  The second most popular location was Manchester with the remainder of take-up spread across the UK.

 

Said Carden, ‘Not only does this research indicate a very healthy increase in data centre activity, the average power requirement – at over 500kw – demonstrates that the majority of these new projects are of a very significant size.

 

GVA Connect sees these figures as a very sound indicator of continued occupier confidence declaring that this follows-on from the steep rise in both the number and size of enquiries they reported in Q4/13.

 

“We continue to see an increase in serious enquiries from US operators for space in both UK and right across EMEA (Europe, Middle East and Africa),” said Carden.

 

Availability

Availability of data centre space in the London Zone is illustrated by new data centre space such as Gateway in London’s West Thurrock (gatewaydatacentre.co.uk).  This has the ability to deliver up to 86,000 square feet of data halls, 50MVA of diverse power, excellent connectivity and 2.0ms round trip latency to the City of London. Similar opportunities currently exist at both London’s Bracknell and Perivale data centres (bracknellandperivaledc.com) which, like Gateway are available as Shell and Core, Powered Shell or can be delivered as Fully Fitted data centres to specific customer requirements.

 

Also currently available are self-contained opportunities within existing established London region data centres such as 30,000 to 50,000 sqft of space at Heathrow in West London with 41MVA of power and 50,000 sqft at Croydon in South London with dual 10MVA potential. (gvaconnect.com/heathrow   gvaconnect.com/croydon ).

 

In the regions too there are data centre opportunities such as the Portal Data Centre in Nottingham with excellent connectivity, existing clients on lease plus planning consents to expand to 70,000 sqft of gross space with power expandable to over 10MVA via diverse feeds.

 

Rising trend

GVA Connect also reports a further rising trend in interest for data centre space from corporate users, cloud service providers and media-related businesses – indicating a relaxation in IT budgets as we move into 2014.

 

Carden added, “We anticipate enquiry and activity levels remaining steady at this higher level throughout 2014 with transactional activity driven by USA operators in Q3/14 and Q4/14. With GVA Connect being  the leading data centre property agency we are ideally placed to assist with both lettings and acquisitions during what promises to be a high-activity year.”

 

 

New London Data Centre Gets Go-Ahead

The new Gateway Data Centre (www.gatewaydatacentre.co.uk) has been announced in London’s West Thurrock, close to the M25 motorway and the A13 road – giving easy access to London Docklands – the heart of the UK’s financial services district and with a very low latency connectivity into The City of London – the country’s financial heart.

 DCME0026GatewayDataCentre

Announced today by Charles Carden, a director of GVA Connect (the data centre specialist division of property agents GVA) he said, “the 2.3 hectare site has been designed to have 8,000 square metres (86,000 sq ft) of data halls split over two floors and a gross internal floor area of 19,500 square metres (210,000 sq ft). Up to 47MVA of diverse power is available meaning the Gateway Data Centre is ideally suited to both normal density and High Density uses.”

 

Ideally suited for users in The City of London where access via diverse fibre routes has a very respectable round trip latency – estimated by fibre providers at between 0.19ms and 0.20ms.

 

The new data centre has full planning permission and being adjacent to an existing global services integration data centre there are a number of fibre providers with diverse routes adjacent to the new Gateway site.

 

Located within an existing industrial and trading estate, and an existing building, the new data centre can be rapidly delivered as either ‘Shell and Core’, as a ‘Fully Powered Shell’ or ‘Fully Fitted’ to customer requirements. It is available on either a freehold or leasehold basis.

 

Full plans have been created for the conversion of the existing building including the building of a new mezzanine, new roof design, changes to elevations to the design shown in the featured graphic plus extensive external plant areas and a 3 metre security fence, vehicular access and vehicle lock, and all necessary planning consents were granted against these plans was granted on 3rd April 2013.

 

Plans are available for inspection by contacting Charles Carden at GVA Connect’s London Stratton Street offices. Or  visit www.gatewaydatacentre.co.uk